Structured cabling, public address, and audio-visual infrastructure — the connective tissue every other system runs on.
Low-current infrastructure is planned early alongside electrical and HVAC design — not run as an afterthought through already-finished ceilings — so cabling pathways, containment, and termination points are clean, documented, and future-upgradeable.